Bucharest, Romania. 27th Aug, 2025: The reconstruction site of the concrete slab covering the Dambovita River in Unirii Square. Severely degraded, the 350-meter concrete slab partly built in 1934 needed urgent repair as it supports the heaviest traff Pillow #836416062
Bucharest, Romania. 27th Aug, 2025: The reconstruction site of the concrete slab covering the Dambovita River in Unirii Square. Severely degraded, the 350-meter concrete slab partly built in 1934 needed urgent repair as it supports the heaviest traff Pillow #836416062