Bottleneck make business run slow, struggle workflow or busy point make project delay, trouble flow, bottleneck analysis, bottlenecking control, workflow improvement concept Hoodie #644230550
This timeless hoodie is a must-have in any wardrobe. It features a pre-shrunk fleece knit, an air jet yarn to provide a softer feel and reduce pilling, a double-lined hood with a color-matched drawcord, and a large pouch pocket. This solid-colored hoodie is made of 50% pre-shrunk cotton and 50% polyester.