A house undergoes active construction and renovation with scaffolding set up along the facade. Part of the roof is already covered with red ceramic tiles, while the remaining section is prepped with waterproofing membrane. Poster #894013148
A house undergoes active construction and renovation with scaffolding set up along the facade. Part of the roof is already covered with red ceramic tiles, while the remaining section is prepped with waterproofing membrane. Poster #894013148